Skip links and keyboard navigation

Flood Recovery - Lockyer: Redinger


(not documented)

Project lead


Natural Disaster Relief and Recovery Arrangements (NDRRA)



(not documented)


On-ground work

Case study type


Funding source

Natural Disaster Relief and Recovery Arrangements (NDRRA)


Funding amount

(not documented)

In-kind contribution

(not documented)

Start date

15 April 2014

End date

30 June 2014


The broader project will assist flood affected landholders identified through SEQ Catchments’, Council and regional industry group investigations to return to production and improve the natural resilience of the waterways.

This project will build help control cattle movement into riparian areas, allowing those areas to regenerate after the effects of recent floods and subsequent earthworks required for road restoration.

This project will:
  • erect 650m of fencing to better manage the riparian areas by allowing control of stock access to Blackfellow Creek and Black Duck Creek
  • install off-stream watering points (three troughs fed by two tanks), connected to a bore pump via 700m of 63OD poly pipe (PN8 and PN12) to better manage ground cover across the property. One trough will be filled directly from the existing main irrigation line whilst the two tanks will be connected via poly pipe.


This project will:
  • improve water quality in Blackfellow and Black Duck Creeks by enhancing the condition of riparian vegetation through stock management.


(not documented)

Reference ID


Last updated: 16 May 2015

This page should be cited as:

Flood Recovery - Lockyer: Redinger, WetlandInfo 2014, Department of Environment and Science, Queensland, viewed 16 March 2018, <>.

Queensland Government
WetlandInfo   —   Department of Environment and Science