Skip links and keyboard navigation

Flood Recovery - Upper Brisbane: Yandilla, Mt. Kilcoy and McCowan

Website/Report

(not documented)

Project lead

Partnerships

Natural Disaster Relief and Recovery Arrangements (NDRRA)

Landholder

Industries

(not documented)

Activities

On-ground work

Case study type

(none)

Funding source

Natural Disaster Relief and Recovery Arrangements (NDRRA)

Landholder

Funding amount

(not documented)

In-kind contribution

(not documented)

Start date

10 May 2014

End date

24 June 2014

Summary

The project is part of the On-Farm Productivity and Riparian Recovery Program which is jointly funded by the Australian and Queensland Governments Natural Disaster Relief and Recovery Arrangements.  Through the Targeted Recovery and Resilience Projects component, SEQ Catchments is assisting flood-affected landholders in the Fassifern, Lockyer and Upper Brisbane regions, to return to production and improve the natural resilience of the waterways.

This project will assist the landholder to stabilise and improve the resilience of approximately 120m of eroded stream-bank along Kilcoy Creek at Mt. Kilcoy through:
  • conducting minor earthworks to re-align the migrating channel and batter the eroded banks to a stable slope
  • establishing perennial ground cover and strategic re-vegetation using 280 local native riparian species on 0.1ha.
  • fencing approximately 120m to protect the restoration site from stock access
  • reinstating essential farm infrastructure, including irrigation access and riparian fencing.

Proposed project monitoring and maintenance:
  • establishing three standard photo-points and taking ‘before and after’ photographs to monitor changes in riparian conditions and recovery over time
  • conducting ongoing maintenance of fencing, stock and fire management in conjunction with control of environmental weeds to encourage and maximise ground cover and natural regeneration.

Benefits

This project will:
  • increase sustainable land management in the upper Brisbane catchment (Kilcoy Creek) by assisting the resumption of agricultural production and promoting natural resilience to withstand future flood events, allowing resources to be allocated to NRM activities.
  • minimise further erosion and negative impacts on water quality in Kilcoy Creek and Somerset Dam.

Lesson

(not documented)

Reference ID

SEQC2136

Last updated: 16 May 2015

This page should be cited as:

Department of Environment, Science and Innovation, Queensland (2015) Flood Recovery - Upper Brisbane: Yandilla, Mt. Kilcoy and McCowan, WetlandInfo website, accessed 20 December 2024. Available at: https://wetlandinfo.des.qld.gov.au/wetlands/resources/tools/wetland-project/flood-recovery-upper-brisbane-yandilla-mt-kilcoy-and-mccowan-a594/

Queensland Government
WetlandInfo   —   Department of the Environment, Tourism, Science and Innovation