Skip links and keyboard navigation

Waterbody Maintenance Program - Topaz Drive wetland, MANGO HILL

Website/Report

(not documented)

Project lead

Partnerships

(not documented)

Industries

Council

Activities

On-ground work

Case study type

(none)

Funding source

(not documented)

Funding amount

(not documented)

In-kind contribution

(not documented)

Start date

2013

End date

2014

Summary

On-going coordinated maintenance as part of the Moreton Bay Regional Council Waterway and Water Body Maintenance program. The main aim is to encourage thick growth of desirable aquatic macrophytes within the waterbody, to reduce future maintenance, provide water quality benefits and improved fauna habitats.

Benefits

This project involves ongoing rehabilitation and maintenance works at the Topaz Drive Wetland. The maintenance required will involve removal of weeds and undesirable plant species from the wetland and newly formalised foreshore planting on a regular basis including on-going re-planting of desirable aquatic species to ensure consistent and healthy plant growth within the wet areas.

Lesson

(not documented)

Reference ID

(none)

Last updated: 31 May 2018

This page should be cited as:

Department of Environment, Science and Innovation, Queensland (2018) Waterbody Maintenance Program - Topaz Drive wetland, MANGO HILL, WetlandInfo website, accessed 30 August 2024. Available at: https://wetlandinfo.des.qld.gov.au/wetlands/resources/tools/wetland-project/waterbody-maintenance-program-topaz-drive-wetland-mango-hill-f1a7/

Queensland Government
WetlandInfo   —   Department of Environment, Science and Innovation